Skip to main content

Plan for Play

Our vision

"To provide high quality, accessible, safe and inclusive play spaces, where everyone of all abilities, across Bournemouth, Christchurch and Poole, can learn, have fun and be active through play.

All ages and abilities should feel safe, confident and excited to use our play spaces as part of leading fulfilled lives with brighter futures."


How your feedback shaped our implementation plan

Over the summer we asked for your views on our play proposals. Six hundred and four people took part, so thank you to everyone who responded. You can find the full consultation reports in Phase 2 below.

The changes we have made as a result of your feedback can be seen in Phase 3 below.

Background to the Plan for Play

More information can be found on the Plan for Play Website.

Key Dates

Consultation Started: 18 July 2025

Consultation Ended: 24 August 2025

Consideration of results: Autumn 2025

Publication of proposals: 04 February 2026

Links

Phases

Phases overview
Phase 2: Consultation Reports
Consultation Reports
Phase 3: Your views made a difference
Your views made a difference

Consultation

18 July 2025 - 25 August 2025

The consultation took place from 18 July to 24 August 2025.

Participants were encouraged to join online, but shorter surveys were also accessible at libraries and face-to-face events.

A total of 604 responses were collected.

There were 11 surveys, one for each zone, with each receiving a varying number of responses.

The results of the surveys can be viewed in Phase Two - Consultation Reports.